About Project
It was around 5000 Tonnage Job. Containing 300 plus Columns, 10 Main trusses and 51 Secondary Trusses. Each truss splits into a minimum of 15 assemblies.
Type of project − ENGINE AND TRANSMISSION MACHINING ENGINEERING WORKSHOP
Client
Building Area or Tonnage
Location
LOD
Standards code Used
L∧T
Around 5000
Haryana, India
LOD 500
IS
Scope
Team Size
Software Used
Project Phase
Building Type
Column, Beam, Truss, Brace, Purlin, Plates
15
Tekla
None
Industrial
Complected manual connections was there we have created Custom components & Parametric components.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Quis ipsum suspendisse ultrices gravida. Risus commodo viverra maecenas accumsan lacus vel facilisis.
Etiam eleifend suscipit nibh lacinia semper. Cras varius facilisis est, at dictum ante malesuada ut. Pellentesque auctor, neque id tincidunt fermentum, dui quam tempus erat, at sollicitudin dolor purus et sem. Integer tristique orci ut eros imperdiet laoreet. Nullam consectetur, tortor eu faucibus tempus, lectus ipsum vulputate ipsum, non volutpat velit leo pretium orci. Praesent sollicitudin fermentum laoreet. Donec eu tempus erat
Case Study 01
Case Study 02
Case Study 03